Project Details

Project Name
Development of 6-lane access-controlled Ludhiana- Bathinda Greenfield highway section of NH-754AD from junction with Moga - Barnala Road (NH-703) near village Tallewal to junction with Delhi - Katra Expressway (NE-5) near Ludhiana (village Ballowal) (from km 30+300 to km 75+543) as a part of Ludhiana - Ajmer Economic Corridor in the state of Punjab on Hybrid Annuity Mode under Bharatmala Pariyojna Phase-I (Package-2).


About the Project:
M/s Ceigall Ludhiana Bathinda Greenfield Highway Private Limited is a Special Purpose Vehicle (SPV) of Ceigall India Limited, incorporated for the execution of the Development of 6-lane Access-Controlled Ludhiana–Bathinda Greenfield Highway Section of NH-754AD (Package-2) in the State of Punjab.
Name of the Authority: National Highways Authority of India (NHAI)
Concession Agreement: Signed on 24th December 2024
Appointed Date: 29th September 2025
Stipulated Date of Completion: 28th September 2027
Construction Period: 730 Days
Mode of Execution: Hybrid Annuity Mode (HAM)
Independent Engineer: Chaitanya Projects Consultancy Pvt. Ltd.
IE Mobilization Date: 1st June 2025
The project involves the development of a 6-lane access-controlled Greenfield highway section of NH-754AD from the junction with Moga–Barnala Road (NH-703) near village Tallewal to the junction with Delhi–Katra Expressway (NE-5) near village Ballowal, Ludhiana, covering Km 30+300 to Km 75+543.
This stretch forms a key segment of the Ludhiana–Ajmer Economic Corridor under Bharatmala Pariyojana Phase–I and plays a vital role in enhancing connectivity, reducing travel time, and boosting economic and religious tourism across Punjab.
Project Highlights or Milestones:
Highlights:
-
Total Project Length: 45.243 km
-
Service Road Length: 18.464 km
-
Configuration: 6-Lane with Paved Shoulder
-
Total Project Cost: ₹981 Crores
-
Flyovers: 03 Nos.
-
Interchanges: 03 Nos.
-
Minor Bridges: 05 Nos.
-
Vehicular Underpasses: 01 No.
-
Light Vehicular / Pedestrian Underpasses: 20 Nos.
-
Small Vehicular / Pedestrian Underpasses: 25 Nos.
-
Vehicular Overpasses: 01 No.
-
Way Side Amenities: 03 Nos.
-
Toll Plazas: 02 Nos.
Milestones:
-
1st Milestone: 150 Days – 26th February 2026
-
2nd Milestone: 365 Days – 29th September 2026
-
3rd Milestone: 550 Days – 2nd April 2027
-
4th Milestone: 730 Days – 29th September 2027


About Sponsor – Ceigall India Limited
Ceigall India Limited (CIL) is one of India’s leading infrastructure construction companies, specializing in the execution of large-scale and technically complex projects across the nation. With proven expertise in highways, expressways, elevated corridors, bridges, flyovers, rail over-bridges, tunnels, and runways, Ceigall has established itself as a trusted name in the engineering and infrastructure sector.
CIL has successfully delivered over 37 projects, including 18 EPC, 2 HAM, 5 O&M, and 12 Item Rate projects in the roads and highways domain. These projects reflect Ceigall’s strong capability in delivering quality infrastructure with precision, safety, and efficiency.
At present, Ceigall is executing 26 major projects, comprising 13 EPC and 7 HAM projects, which include elevated corridors, expressways, bridges, flyovers, metro works, and multi-lane highways under various flagship programs such as the Bharatmala Pariyojana.
Renowned for its efficiency and execution excellence, Ceigall India Limited has a consistent track record of completing projects ahead of schedule, demonstrating its commitment to quality, innovation, and timely delivery.
About Laboratory
The Project Laboratory at Ceigall Ludhiana Bathinda Greenfield Highway (LBG–02) plays a critical role in ensuring the highest standards of quality control and assurance throughout project execution. The lab operates under the supervision of the Independent Engineer and in coordination with NHAI representatives, maintaining strict adherence to specifications and testing protocols.
Key laboratory activities include:
-
Conducting FDD (Field Density Determination) tests at site to verify pavement compaction levels.
-
Sampling and gradation testing of GSB materials to ensure compliance with approved mix designs.
-
Gradation analysis of WMM materials in coordination with the Independent Engineer.
-
Concrete cube strength testing witnessed by the Independent Engineer for structural quality validation.
-
Calibration of sand pouring cylinders and other field testing equipment to maintain accuracy.
-
Preparation of daily laboratory reports (DPRs) documenting all material testing and quality checks performed at site.

2025
Project Initiation Year
45.243km
Total Highway Length
6-lane
6 Lane with Paved Shoulder
150+
Workforce Deployed On-Site
PROJECT GALLERY
From the Director's Desk



CLIENT
The National Highways Authority of India (NHAI), under the Ministry of Road Transport and Highways, is the apex body responsible for the development, maintenance, and management of the National Highway network across India.
NHAI plays a pivotal role in implementing flagship programs like Bharatmala Pariyojana, driving large-scale infrastructure growth and enhancing connectivity nationwide.
CONTACT
Inquiries
Ceigall India Ltd. Camp
Near Indian Oil Petrol Pump Raikot–Sudhar Road
(SH-13) Halwara – 141107
Registered Office
Contact Us
Corporate Office
Get a quote: +91- 6239641985
About
We are an infrastructure construction company with experience in undertaking specialized structural work such as elevated roads, flyovers, bridges, railway over bridges, tunnels, highways, expressways, runways, bus terminal and solar transmission.